Box 7
Container
Contains 261 Collections and/or Records:
Showing flow of water through completed ditch. (after severe rain storm), April 9, 1935
Item — Box: 7, item: 1-23-5
Grading dirt removed from new ditch. Below bridge., February 12, 1935
Item — Box: 7, item: 2-23
Right hand side of ditch o be opened up, under bridge., February 12, 1935
Item — Box: 7, item: 3-23
Ditch under right hand side of bridge opened up., March 12, 1935
Item — Box: 7, item: 3-23-2
Drainage ditch above bridge to be widened and straightened, February 12, 1935
Item — Box: 7, item: 4-23
Drainage ditch above bridge - No work done on this section. Showing flow of water through ditch. (after severe rain storm), April 9, 1935
Item — Box: 7, item: 4-23-2
Section of ditch below cut., March 12, 1935
Item — Box: 7, item: 5-23
Flow of water through ditch, March 12, 1935
Item — Box: 7, item: 6-23
Reconditioned office building end view, undated
Item — Box: 7, item: 1-29
Found in:
Special Collections and University Archives
/
Work Projects Administration in Maryland records
/
Maryland WPA Photographic Collection
/
Maryland Emergency Relief Administration Negatives Collection (MERA)
/
4-B4-29 -- Towson -- New Annex#1 - Office Bldg., Work Division - B.C.W.B., PA. and Del. Ave.
Dates:
undated
Reconditioned office building side view, undated
Item — Box: 7, item: 2-29
Found in:
Special Collections and University Archives
/
Work Projects Administration in Maryland records
/
Maryland WPA Photographic Collection
/
Maryland Emergency Relief Administration Negatives Collection (MERA)
/
4-B4-29 -- Towson -- New Annex#1 - Office Bldg., Work Division - B.C.W.B., PA. and Del. Ave.
Dates:
undated